av网站分享-国产色拍-国产蝌蚪视频在线观看-久久精品 一区-久久精品国产一区二区-亚洲一区二区三区亚洲-www.色网站-一本久中文视频-日韩欧美国产精品一区二区三区-日韩专区第一页-亚洲无码精品一区二区久久

Language:CHINESESENGLISH

Home > News > Scope of steel structure quality warranty
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.rlmp.com.cn

Scope of steel structure quality warranty

Time:[2023-3-25]  Hits:3991

The scope of steel structure quality warranty generally includes the following aspects:


1. Warranty Period: Generally, the warranty period for steel structure engineering is two years, that is, from the date of completion acceptance, free maintenance will be provided for project quality issues within two years.


2. Foundation engineering: The quality warranty scope of steel structure engineering includes related foundation engineering, such as foundation, groundwater level control, foundation settlement, and other issues.


3. Steel quality: The quality warranty scope for steel structures also includes steel quality issues, such as steel strength, toughness, deformation ability, and other issues.


4. Welding quality: The scope of quality warranty for steel structures also includes quality issues related to steel structure welding, such as weld joint strength, weld quality, porosity, cracks, and other issues.


5. Surface treatment: The quality warranty scope for steel structures also includes quality issues related to surface treatment, such as corrosion prevention, rust prevention, and paint spraying.


6. Installation quality: The scope of quality warranty for steel structures also includes installation quality issues, such as installation plans, installation processes, node connections, and other issues.

 

In summary, the scope of quality warranty for steel structures should cover the entire process from design, material procurement, manufacturing, processing, installation, to acceptance, and should be specified and negotiated based on specific circumstances.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)