av网站分享-国产色拍-国产蝌蚪视频在线观看-久久精品 一区-久久精品国产一区二区-亚洲一区二区三区亚洲-www.色网站-一本久中文视频-日韩欧美国产精品一区二区三区-日韩专区第一页-亚洲无码精品一区二区久久

Language:CHINESESENGLISH

Home > News > After the snow sweeping steel roof snow to avoid collapse
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.rlmp.com.cn

After the snow sweeping steel roof snow to avoid collapse

Time:[2014-6-14]  Hits:6200

Some steel construction collapsed at the beginning of the design there is a problem, some companies to reduce costs, casually invited guerrillas construction, the construction itself is low quality, so a bad weather, the problem is exposed, and this is the time Many gas stations, industrial plants stand up to wind and snow simple test of a major factor. Quiz heaviest snow per square meter 90 kg, and the lack of snow and ice melt, the formation of two snow backlog, the construction of additional load.

 

On industrial plants, vegetable greenhouses and other construction backlog snow collapsed things often happen, and these are mostly used in the construction of the collapse is light steel structure. Snow removal for the current status of the object we are more concentrated in the road, and co-workers about the steel industry experts and Foshan appeal: Winter snow to sweep the floor to the roof in addition to more snow, the snow must as soon as possible on the cleanup of industrial plants to avoid the backlog overweight causing collapse. Light steel construction doubt why repeated collapse?

Some houses do not appear collapsed, but there are still many problems, not overloading beams also cause deformation recovery, significantly decreased the formation of strong wind resistance to the construction material, and under the roof of the scratch will lead to poor roof drainage, simple leaking. Thus, when the winter snows, Nanning steel construction units must prompt the owners to do Kiyoshi preparation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號