av网站分享-国产色拍-国产蝌蚪视频在线观看-久久精品 一区-久久精品国产一区二区-亚洲一区二区三区亚洲-www.色网站-一本久中文视频-日韩欧美国产精品一区二区三区-日韩专区第一页-亚洲无码精品一区二区久久

Language:CHINESESENGLISH

Home > News > Multi-storey and high-rise steel column base grouting requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.rlmp.com.cn

Multi-storey and high-rise steel column base grouting requirements

Time:[2014-8-27]  Hits:6401

Multi-storey and high-rise steel column base grouting requirements

[Student] multi doubt rise steel column base grouting and regulations?
[Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom end of the steel column column grouting, grouting way is to stand around in the column foot template, based on a clean surface to clear, and then polymerized with high strength mortar poured from the Liberal side to dense, after filling with wet straw bags or sacks conservation.
Above all finishing work according to the participants encountered in actual questions from, for reference, if in doubt please timely communication, correct me. Foshan Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號