av网站分享-国产色拍-国产蝌蚪视频在线观看-久久精品 一区-久久精品国产一区二区-亚洲一区二区三区亚洲-www.色网站-一本久中文视频-日韩欧美国产精品一区二区三区-日韩专区第一页-亚洲无码精品一区二区久久

Language:CHINESESENGLISH

Home > News > steel girder segment energy dissipation structure connected column which requests?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.rlmp.com.cn

steel girder segment energy dissipation structure connected column which requests?

Time:[2015-10-31]  Hits:5900

Guangzhou Steel tells you: steel girder segment energy dissipation structure connected column which requests?


Link beam connection with a rigid frame column nodes, connected with the general framework slightly different pillars.
When energy beams and column connections, its length should not be greater than 1.6M1p / Vb, energy beams between the flange and the webs between the link beam and column flange or flange (when link beam and column web connections) should selection groove full penetration butt welds, fillet welds should be used between the web and post-energy beams instead of bolting, due to slip the bolts will affect the ductility and energy dissipation capacity.
Carrying Capacity of fillet welds shall not be less than the axial bearing capacity web link beam, shear capacity and flexural capacity. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號