av网站分享-国产色拍-国产蝌蚪视频在线观看-久久精品 一区-久久精品国产一区二区-亚洲一区二区三区亚洲-www.色网站-一本久中文视频-日韩欧美国产精品一区二区三区-日韩专区第一页-亚洲无码精品一区二区久久

Language:CHINESESENGLISH

Home > News > Quality Management of Steel Structure Construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.rlmp.com.cn

Quality Management of Steel Structure Construction

Time:[2016-1-9]  Hits:5924

Guangzhou Steel tells you: Quality Management of Steel Structure Construction

Raw materials and finished approach: note the quality of imports of steel products shall comply with the new design and contract standards. Admission test to check the main qualification documents of product quality, the Chinese flag and inspection reports (including sampling reinspection report) and the like.
Steel Welding Engineering
Fasteners connection project: Note that when ordinary bolt as a permanent attachment bolts, when the design requirements or their quality is doubtful, you should check the bolts and physical reinspection report:
Steel parts and steel parts processing;
Installation of steel structures;
Steel coating.
Guangzhou Steel remind you; Additional Notes: steel construction process for temporary reinforcement, steel members supporting its raw materials, manufacture, welding, installation, corrosion, etc. should comply with the relevant technical standards and specifications.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號